Our Projects

Laboratory for Regenerative Medicine

We were instructed by University of Bristol Capital Maintenance and Infrastructure following a competitive tender process to carry out a comprehensive remodel and refurbishment of parts of level B and level C of the School of Medical Sciences to form a category two laboratory for research in to regenerative medicine. The 16 week project started in June 2013 under a JCT Minor Works Contract 2011. Works included the protection of existing Autoclaves to be moved and re-commissioned later in the programme, light strip out of area including all M&E and extensive demolitions of dividing concrete walls. New block work walls were then built and the area was skimmed throughout. All new M&E was then run surface. Mechanical included hot and cold water, air conditioning, extraction, steam and wastes. Electrical works included power, lighting, fire alarms and data. Finishes included new carpentry and joinery, suspended ceilings, tiling, decorations, floor coverings and specialist laboratory benching. The specified works were successfully completed in September 2013 and the final account figure was in excess of £550,000 plus VAT.