Unit 8 Monarch Court

We were instructed by Jones Lang LaSalle following a competitive tender process to carry out the refurbishment of 8 Monarch Court. The 6 week project started in July 2014 under a JCT Minor Works Building Contract 2011. Works included a full scaffold to enable roof repairs, overhaul of gutters, cleaning of sofits and fascia. Marrs colour revival polishing of powder coated window frames. Refurbishment of bike shelter, general paver replacements, cleaning and landscaping. Strip out of departed tenants fit out including glazed and stud partitions, server room and kitchenettes. Strip out of all lighting, data cabling, ceiling tiles and floor coverings. Strip out of hot and cold, wastes and AC units where no longer required. Overhaul and repair of existing duct work and VES system. Light refurbishment to existing WC’s inc. making good minor damage, redecoration and cleaning. Regularisation of floor box layout and fire alarm inc. general repairs Suspended ceiling grid repairs and replacement of all tiles, decorations and floor coverings throughout. The specified works were successfully completed within the 6 week programme and the final account figure was in excess of £190,000 plus VAT.