Our Projects

Units A-D Delta Drive Tewksbury

We were instructed by Hartnell Taylor Cook, following a competitive tender process, to carry out a comprehensive refurbishment of Units A-D Delta Drive, Tewksbury. The 16-week project started in March 2014 under a JCT Design and Build Contract 2011. Works included a full scaffold to enable a MARRS coating colour restoration system to be applied to existing windows, renewed gutter linings, renewed roof lights and a Delcoat roof coating to extend the life of the existing roof. Within Unit A block a full height wall used to compartmentalise the unit by the previous tenant was removed, along with remodelling and a light strip-out of the existing office space ready for refurbishment. New window openings were made to the staff canteen on the ground floor, and new windows fitted to match the existing. Rear fire exit doors were replaced with new as they were beyond economic repair, along with new electrically operated sectional shutter doors being installed. The Units were then refitted internally. The offices received new lighting, power and associated compartmentalised trunking, addressable fire alarm system, gas fired central heating system, suspended ceilings, redecorations and floor coverings. Toilets and kitchenettes received as above but with new cubicles, sanitaryware and units respectively. The warehouse spaces were fully prepared and redecorated, the floors shot-blasted and resealed with a resin floor finish, Flowseal EPW. New lighting and power was installed and the existing space heating system received a full service and overhaul. Externally, repairs were made to the existing hard standings and the front car parks re-landscaped. The specified works were successfully completed within the programme and the final account figure was in excess of £495,000 plus VAT.