Following a competitive tender process, in August 2020, we were awarded the 16-week contract to undertake the refurbishment of two adjoining industrial units at Westmead Industrial Estate, Swindon.
The two units, which totalled over 20,000 sq.ft, had been vacated over 12 months prior to work starting. They were both in a dilapidated state of repair with extensive former tenant fit-out that required removing to reinstate the units back to FRI condition.
Externally, works included:
Cladding and roofing repairs
Replacement cappings and trims where required
Gutter linings
A full clean down and redecoration using specialist spray-applied coatings to wall cladding, windows, doors, and roof sheets
The project was completed in late November 2020 on a program ready for the new incoming tenant, Network Rail.
The works were procured to us under a JCT Intermediate Contract with Contractors Design and the final account was just over £600,000.
Throughout the project, our team worked closely with the client. Due to a tenant being found as the project was being instructed, there were extensive changes to the scope of works.
Our transparent, collaborative approach was key throughout this process, and the engaged and passionate team ensured the additional works were delivered within the program.