Client
Staffordshire County Council Pension Trust c/o Colliers
Sector
Industrial & Logistics
Area
20,000 sq.ft
Location
Swindon
Value
£600,000
Start And Length
August 2020 - 16 weeks
Contract
JCT Intermediate Contract with Contractors Design Portion 2016

Challenge

Following a competitive tender process, in August 2020, we were awarded the 16-week contract to undertake the refurbishment of two adjoining industrial units at Westmead Industrial Estate, Swindon.

The two units, which totalled over 20,000 sq.ft, had been vacated over 12 months prior to work starting. They were both in a dilapidated state of repair with extensive former tenant fit-out that required removing to reinstate the units back to FRI condition.

Externally, works included:

Cladding and roofing repairs

Replacement cappings and trims where required

Gutter linings

A full clean down and redecoration using specialist spray-applied coatings to wall cladding, windows, doors, and roof sheets

Approach

Following a drainage survey, we were instructed to complete additional remedial / repair works. Trees were pollarded, and general soft landscaping was cut back and tidied. Areas within the car park were ground off, and tarmacadam resurfaced, including relining.
 
Block paved car parking bays and slabbed footpaths were also relaid back to level, and concrete hardstanding was repaired and replaced where required. Plant areas were secured with new palisade fencing and gates.
 
Internally, both units were fully stripped out, including additional office content previously built by the former tenants. Making good was completed upon completion of the strip-out works.
 
Mechanical and electrical systems were amended to suit the new layouts, including overhauling and replacement where necessary, as well as all new lighting throughout all areas.
 
The warehouse areas received a deep clean, full redecoration, including resin floor coatings. Sectional loading doors were all overhauled. Office and circulation areas were fully redecorated, replacement ceiling grids and tiles, new floor coverings and tea point installations. W.C.s were fully refurbished, including IPS systems, sanitary ware, tiling, decorations, and replacement ceiling grid and tiles.

Sustainability

Results

The project was completed in late November 2020 on a program ready for the new incoming tenant, Network Rail.

The works were procured to us under a JCT Intermediate Contract with Contractors Design and the final account was just over £600,000.

Throughout the project, our team worked closely with the client. Due to a tenant being found as the project was being instructed, there were extensive changes to the scope of works.

Our transparent, collaborative approach was key throughout this process, and the engaged and passionate team ensured the additional works were delivered within the program.