0
Area
0
Value
0
Week Programme
Client
Knight Frank C/O Circle Property PLC & Carter Jonas C/O Fertility Bristol Ltd.
Sector
Healthcare
Area
13454 sq.ft
Location
Bristol
Value
£2,600,000
Start And Length
Phase 1: 28 weeks; Phase 2: 16 weeks
Contract
JCT Intermediate with Contractor’s Design Portion

Challenge

The project involved transforming an office space into a state-of-the-art fertility clinic, requiring both CAT A and CAT B works. 

Delivering a clinical facility with specialised spaces such as operating theatres, laboratories, and consulting rooms within tight programme timelines posed a significant challenge. 

Additionally, the extensive mechanical & electrical (M&E) requirements, including backup generators, medical gas storage areas, and alarm systems, added complexity to the works. The project required precise planning to ensure compliance with clinical standards and timely delivery for the client.

Approach

Our team implemented a phased approach, focusing on close collaboration with all stakeholders to ensure alignment on design and delivery goals. 

Proactive communication, detailed scheduling, and rigorous health and safety protocols ensured the smooth progression of the project, meeting both programme and quality requirements.

Phase 1:
  • CAT A and CAT A+ refurbishment works, including the construction of a new entrance lobby, roof repairs, and replacement of windows, doors, and louvres.

  • External works, such as building clean-downs, decorations, landscaping, and installation of acoustic fencing, cycle storage, and bin storage.

Phase 2:
  • Full CAT B fit-out to transform the space into a clinical facility. This included operating theatres, a day patient ward, consulting rooms, laboratories, clerical/admin offices, and welfare areas.

  • Installation of extensive M&E systems, including medical gas storage, backup generators/ uninterrupted power supply (UPS), LED lighting, CCTV, alarm systems, and electric car charging points.

  • Upgrades included partitions, suspended ceilings, floor coverings, decorations, and the replacement of the lift.

Sustainability

The project included the installation of energy-efficient LED lighting, electric car charging points, and hard and soft landscaping, aligning with sustainability goals while reducing operational costs and environmental impact.

Results

The project was completed on time and within budget in December 2021. The Bristol Centre for Reproductive Medicine now operates from a modern, high-specification clinical facility designed to meet the client’s needs and industry standards.

Special design features

Key features included extensive mechanical & electrical installations for medical gases, LED energy-efficient lighting, and acoustic fencing. The addition of electric car charging points and high-quality landscaping further enhanced the functionality and sustainability of the facility.