0
Area
0
Value
0
Week Programme
Client
Cribbs Mall c/o TFT
Sector
Retail & Leisure
Area
Undisclosed
Location
Bristol
Value
££163,000
Start And Length
January 2020 - 5 weeks
Contract
Cribbs Mall c/o TFT

Challenge

The replacement signage scheme at The Mall, Cribbs, involved refurbishing and upgrading the external signage structures, including large totem poles.

The project required detailed structural assessments and repairs while ensuring minimal disruption to the retail environment during the works.

Approach

Our team adopted a meticulous approach, combining structural integrity assessments with careful removal and replacement processes. Close coordination with the mall management team ensured the programme ran smoothly within the 5-week timeframe.

The works included:

Decorations to metal frameworks and totem poles

Structural repairs to large totem poles, including assessments, welding of strengthening plates, and replacement bolts

Removal of existing signage panels and installation of new panels

Replacement of electrical isolators to low-level signage

Removal of redundant lighting panels from totem poles

Installation of updated graphics and branding

Sustainability

The removal of redundant lighting panels and structural upgrades contributed to reducing long-term maintenance and energy demands.

Results

The project was successfully delivered within the scheduled five-week programme, ensuring the signage at The Mall, Cribbs, was fully upgraded and structurally sound. The refurbished and modernised signage enhances the overall aesthetic and functionality of the external branding.

Special design features

Structural repairs and updated electrical isolators were integrated to improve the safety, durability, and visual impact of the totem poles and signage framework.